Gary A. Nowakowski 622 Oak Berry Dr. Kemah, TX 77565 garynowakowski@gmail.com (832) 385-6718 Oil, Gas, Chemical, Manufacturing, & Energy
Industries Profile Summary Detail
oriented and self-motivated with a direct understanding of the Construction
& Engineering fields. Experienced in a range of project types to include;
Enterprise, Alliance, Joint Venture, Capital, Turn Around, Expense, and
Greenfield. My work experience includes oil & gas, refining, chemical,
petrochemical, industrial gas, hydrogen, syngas, gasification, natural gas
processing, compressor stations, metering stations, pump stations,
alternative fuels, biofuels, facility pipelines, power and manufacturing.
Expertise in change management, estimating, scheduling, and cost control have
provided the foundation needed to meet all new challenges effectively and efficiently.
Committed to a safe and team integrated environment. Proficient communicator
with management and all parties involved to ensure the success of the
company’s core values and visions. Education Point
Loma Nazarene University: San Diego, CA 92106 Bachelor’s
Degree in Business Communication: December 16, 1994 Courses, Certifications, and travel/access documents ·
U.S. Passport ·
U.S. Department of Homeland Security: TWIC card ·
Greater Houston Area Safety Council Cards Obtained:
(HASSC, ISTC & ARSF) ·
Innovative Turnaround Controls: Certified in Primavera 6
Scheduling & Planning ·
Jacobs Engineering Group: Project Controls Short Courses ·
Jacobs Field Services, NA: Level I Supervisors, Leadership
Safety Excellence II, and Beyond Zero Certifications Current and Past Affiliations ·
AACE International, the Association for the Advancement of
Cost Engineering, Member ·
PMI, Project Management Institute, Member ·
Phi Chi Theta, National Business Fraternity, Past Chapter
V.P. ·
Point Loma Rotaract, a Subsidiary of Rotary International,
Charter Member ·
Tau Kappa Epsilon, International Fraternity, Theta Upsilon
Chapter, Member Computer Usages & Proficiencies Microsoft-(Word,
Excel, Access, Power Point, Visio, and Project), Lotus 1.2.3, Track,
Primavera P6, Hard Dollar, Live-Link, SAP, PDS, Adobe In-Design, Proprietary,
and Project Management Information Systems. Professional Experience L-Con,
Inc. Engineers & Constructors Proposal
Manager (October 2013-April 2015) Staff Position Home
office controls; Houston, Texas Responsibilities
included: · Initiated,
anticipated, and documented issues and reported to executive management, and
addresses with the department managers accordingly. · Organized
and participated in proposal or functional meetings. Created an Action
Items Log and followed up with the responsible persons for the close out of
action items. · Drove the
proposal budget based on estimates provided for identified proposal scope of
work. · Supported
the constructability assessments for new projects, by working closely with
the project teams and the Client. · Assists in
managing the development of the contracting strategies and commercial terms
for the project and finalizing the project agreement. · Manages
and apply risk management to any project risks to ensure risk is minimized
within the defined work scope. · Worked
with the proposal team to develop the proposal schedule and conducted regular
reviews and updates to the schedule based on project progress and change. · Developed
and implemented the Proposal Communication plan that contains a Proposal
Schedule and regularly scheduled Update Meetings. · Developed
the proposal deliverables plan and oversaw the management of the proposal
deliverables. · Scheduled
and led the internal reviews with executive management. Willbros
Group Senior
Estimator (August 2012- October 2013) Staff Position Home
office controls; Houston, Texas Responsibilities
included: · Responsible
for estimating downstream, mid-stream, and facility pipeline projects
(terminals, compressor/pump stations, refinery, and chemical projects)
ranging from 500K to 45MM on (E/P/C/M) projects. · Schedule
all meetings related to the estimate, prepared takeoffs, selected and
validated vendor/subcontractor quotes, produced risk registers, presentations
estimate in corporate reviews. S&B
Engineers and Constructors Lead
Scheduler (January 2011-August 2012) Staff Position Field
office controls; Houston, Texas Lead
scheduler for Lyondell-Basell Houston Refining Alliance Contract Responsibilities
included: · Led the
effort on building, maintaining and reporting (weekly, 3 week look ahead, and
monthly) reports for 100 construction schedules with engineering milestones
to include Capital, Expense, and Turnaround Projects. · Temporarily
took over the role of reporting progress for 4 months along with my other
duties. This entailed setting up new jobs and maintaining existing projects
as needed to support the Clients weekly and monthly cost/progress reports on
160 construction projects · Supported
the work effort on KPI reports Kiewit
Corporation Lead
Estimator (July 2009-January 2011) Staff Position Home
office controls; Houston, Texas Kiewit
Energy/Kiewit International Projects Responsible
for: Leading
a group of (1-14) estimators on (1-3) projects concurrently to develop conceptual,
budgetary, definitive, and lump sum (TIC) estimates. Defining
the scope, generating a basis of estimate, selecting historical data and/or
factors to apply to the project, archiving all information upon completion of
the estimate, sourcing vendors/subcontractors and validating there quotes,
building lift plans, assigning construction equipment/facilities/staff to the
project, generated project org. charts, hand sketched piping isos and general
arrangements when engineering was not complete. Scheduled
job kick off meetings with all stakeholders, generated lists of deliverables,
presented the final estimate in the corporate review. Generated
training modules which were presented to other estimators on a weekly basis. Projects
worked on include the following: · (EPC) -
Cobra Castor Underground Gas Storage Project: Wellhead platform bridge linked
to a production, utilities, and quarters off the shores of Spain · (EPCM)
Tenaska Energy: Taylorville Energy Center (IGCC): Taylorville, IL. Kiewit
Energy Co. and the engineering firm Burns & McDonnell to conducted the
Front End Engineering and Design (FEED) study and facility cost report 3.5B
TIC for the Taylorville Energy Center (TEC), a 720 MW (600 MW net) hybrid
IGCC electric generating facility · (C) Tesoro
Refinery: Crude Unit T/A: Kenai, AK · (C) B.P.
Whiting: Coker Unit Expansion: Whiting, IN entailed modular structures,
piping, equipment, and foundations for the new expansion. · (C) Jordan
Cove Liquefaction Project. Located in Coos Bay, Ore. consisted two full
containment storage tanks, each with a capacity of 160,000 cubic-meters, a
single marine berth for loading liquefied natural gas, and a dedicated
tractor tug dock Starcon
International, Inc. Project
Estimator (February 2009-June 2009) Home
office controls; La Porte, Texas · Estimates
performed included: (C) Lyondell Channelview Chemical Complex T/A, (C) Valero
Benicia Refinery T/A & Maintenance, (C) Shell Martinez Refinery T/A &
Maintenance. Responsible for: · Provided
T&M, Cost-reimbursable, and lump sum estimates for maintenance, capital
and turn around projects in the U.S. and overseas. · Scheduled
and lead all estimate related meetings. · Conducted
estimate reviews with project management and the clients. · Sourced/validated
vendor and sub-contractor quotes. · Establish
escalation, contingency, fees and taxes for projects. · Prepared
and submitted final proposals. Jacobs
Engineering Group, NA Lead
Estimator/Cost Engineer (October 2007-February 2009) Staff Position Home
office controls; Houston, Texas Cost
Engineer responsibilities for B.P. Texas City Operations: · Responsible
for (EPC) & (EPCM) Portfolio values of 650MM to include: (Blue Skies,
Sunrise, and ABF compliance programs) & (Alliance Projects) · Accountable
for monitoring Jacobs and overall Alliance program portfolios. · Responsible
for project tracking cost and showing trends. · Accountable
for providing input for reporting and forecasting cash flow. · Monitor
commitments and expenditures against approved DSP budget. · Analyze
project performance and interface with project engineers · Responsible
for ensuring accurate DSP budgets and forecasts are loaded into the cost
system. · Performed
change documentation. · Ensured
contingency is accurate. · Cost
Coding. · Ensured
TIC reports accurately report costs and sales tax. · Provided
DSP/WBS which is used to recast estimates into budget for SAP. · Worked
with Project manager and Project Engineer to recommend mitigation and recovery
plans. · Accrued
material and equipment for field services and engineering. · Provided
input for schedule resource loading. · Perform
change management roles. Lead
Estimator responsibilities: B.P.
Texas City Operations; Estimated Execution Stage Projects and converted
budgetary estimates to Lump Sum (project values 42MM TIC and below). Bayer
Baytown Operations, Chemical Plant 2008 Plant-Wide Turn-Around; performed
unit price quantity take offs for structural, piping, civil, electrical,
mechanical and instrumentation. Prepared proposal submittal packages with
vendor and subcontractor pricing. Lyondell-Basell
Houston Refining Alliance Contract: Responsible for providing labor,
material, subcontractor, and vendor estimates along with change orders for;
Capital, Expense, and Turnaround Projects. The estimates supported 250 up to
650 people onsite with an Evergreen (Annual Renewable) Contract Value: $20MM
min. Emerald
Contracting, CA Project
Manager-Ending Position (1988-2006) Staff Position Home
office controls; San Diego, California Responsibilities
included: Generating/assisting
with estimates and managing/executing projects for; General Motors Rancho
Cucamonga, San Diego Food Bank, San Diego Sheriff’s Dept., County of San
Diego Libraries, SDSU University, Cal Western Reconveyance Corp., Amylin
Pharmaceuticals, Hybertech Pharmaceuticals, AMI Hospitals, HealthSouth, PRN
Physical Rehabilitation Network and JELD-WEN Manufacturing. References:
Available upon request |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|